Function 8



Function Objective

 

Support the establishment/management of temporary medical triage and treatment sites established following a disaster event to provide health care to disaster victims and displaced personnel.

 

 

 

 

Element 8.1            Designation / Activation

 


Standard:

LEMSAs shall ensure development of plans for assessing the need to activate, the establishing, and ment/managingement of temporary field medical triage and treatment sites (FTS) following a disaster to provide health care to disaster victims and displaced personnel.

 

 

Guideline 8.1.1

Designation of Field Treatment SitesAssessment of need for Field Treatment Sites

 

 

 
 

 

 

 

 

 


LEMSA should ensure development of criteria for determining the need to activate FTS that include:

 

·        Estimates of numbers and locations of casualties.

·        Status of medical facilities.

·        Status of the transportation system.

·        Availability of personnel and other resources.

 

Guideline 8.1.2

Designation of Field Treatment SitesDesignation of Field Treatment Sites

 

 

 

 
 

 

 

 

 

 


(1)   LEMSA criteria for the designation of temporary field medical triage and treatment sites (FTS) should include:

 

·        Proximity to hospitals.

·        Proximity to shelters.

·        Proximity to other areas with high probability of having large numbers of casualties.

·        Distribution of locations in potential high-risk areas throughout the affected area.

·        Ease of access for staff, supplies and casualties.

·        Ease of evacuation by air or land.

·        Ability to secure the area.

 

(2)   LEMSA should identify facilities with which OES and other agencies have existing agreements as potential sites for temporary field medical treatment sites.


Guideline 8.1.23

Establishment of Field Treatment Sites

 

 

 

 
 

 

 

 

 


LEMSA plans for the establishment of FTS should include:

 

·        Procedures and criteria for designating managers of FTS.

·        Communication procedures.

·        Procedures for acquiring needed resources.

·        Status reporting procedures.

 


Element 8.2    Personnel, supplies, and other resources

 

Standard:

LEMSAs shall ensure the development of plans and procedures to respond to the personnel, supply and other resource needs of temporary medical triage and treatment sites.

 

 

Guideline 8.2.1

Resource Support for Field Treatment Sites

 

 

 
 

 

 

 

 


LEMSAs should incorporate the following into their planning for Field Treatment Sites:

 

·        Procedures and criteria for designating managers.

·        Procedures for providing staff, supplies and other resources.

·        Estimates of casualties and resource requirements.

·        Evaluation and modification (if necessary) of Field Treatment Point Supply List (see EMS Authority website).

·        Assessment of the feasibility of developing and maintaining resource caches.

·        Development of manuals for FTS setup, management, and operations.

·        Pre-event designation and training of potential FTS managers.

·        Assessment of the feasibility of development and support of Disaster Medical Assistance Teams.

 

 

 

 


Element 8.3            Integration into system

 

Standard:

LEMSAs shall ensure the development of plans and procedures for the integration of temporary medical triage and treatment sites into the overall disaster medical response system.

 

 

 

Guideline 8.3.1

Designation of Field Treatment Sites

 

 
 

 

 

 

 

 

 


LEMSA plans for FTS should address the contingency that FTS may need to operate for extended periods of time.  FTS planning should include plans, procedures, and interagency agreements for:

 

·        Ensuring power, water, and shelter.

·        Providing communications support.

·        Providing relief personnel.

·        Ensuring ongoing medical re-supply, and casualty evacuation.